summaryrefslogtreecommitdiff
path: root/kernel/sched
diff options
context:
space:
mode:
authorIngo Molnar <mingo@kernel.org>2023-10-23 11:32:25 +0200
committerIngo Molnar <mingo@kernel.org>2023-10-23 11:32:25 +0200
commit4e5b65a22ba0cabe58f895cd797cb10a763d6994 (patch)
tree067033eb0d1d284b6ca89c2bfa4034906ff59ad9 /kernel/sched
parent4c456c9ad334a940e354da1002184bc19f4493ef (diff)
parent05d3ef8bba77c1b5f98d941d8b2d4aeab8118ef1 (diff)
Merge tag 'v6.6-rc7' into sched/core, to pick up fixes
Pick up recent sched/urgent fixes merged upstream. Signed-off-by: Ingo Molnar <mingo@kernel.org>
Diffstat (limited to 'kernel/sched')
-rw-r--r--kernel/sched/fair.c74
1 files changed, 60 insertions, 14 deletions
diff --git a/kernel/sched/fair.c b/kernel/sched/fair.c
index 4b70b0d14698..aa2091a08034 100644
--- a/kernel/sched/fair.c
+++ b/kernel/sched/fair.c
@@ -857,14 +857,16 @@ struct sched_entity *__pick_first_entity(struct cfs_rq *cfs_rq)
*
* Which allows an EDF like search on (sub)trees.
*/
-static struct sched_entity *pick_eevdf(struct cfs_rq *cfs_rq)
+static struct sched_entity *__pick_eevdf(struct cfs_rq *cfs_rq)
{
struct rb_node *node = cfs_rq->tasks_timeline.rb_root.rb_node;
struct sched_entity *curr = cfs_rq->curr;
struct sched_entity *best = NULL;
+ struct sched_entity *best_left = NULL;
if (curr && (!curr->on_rq || !entity_eligible(cfs_rq, curr)))
curr = NULL;
+ best = curr;
/*
* Once selected, run a task until it either becomes non-eligible or
@@ -885,33 +887,75 @@ static struct sched_entity *pick_eevdf(struct cfs_rq *cfs_rq)
}
/*
- * If this entity has an earlier deadline than the previous
- * best, take this one. If it also has the earliest deadline
- * of its subtree, we're done.
+ * Now we heap search eligible trees for the best (min_)deadline
*/
- if (!best || deadline_gt(deadline, best, se)) {
+ if (!best || deadline_gt(deadline, best, se))
best = se;
- if (best->deadline == best->min_deadline)
- break;
- }
/*
- * If the earlest deadline in this subtree is in the fully
- * eligible left half of our space, go there.
+ * Every se in a left branch is eligible, keep track of the
+ * branch with the best min_deadline
*/
+ if (node->rb_left) {
+ struct sched_entity *left = __node_2_se(node->rb_left);
+
+ if (!best_left || deadline_gt(min_deadline, best_left, left))
+ best_left = left;
+
+ /*
+ * min_deadline is in the left branch. rb_left and all
+ * descendants are eligible, so immediately switch to the second
+ * loop.
+ */
+ if (left->min_deadline == se->min_deadline)
+ break;
+ }
+
+ /* min_deadline is at this node, no need to look right */
+ if (se->deadline == se->min_deadline)
+ break;
+
+ /* else min_deadline is in the right branch. */
+ node = node->rb_right;
+ }
+
+ /*
+ * We ran into an eligible node which is itself the best.
+ * (Or nr_running == 0 and both are NULL)
+ */
+ if (!best_left || (s64)(best_left->min_deadline - best->deadline) > 0)
+ return best;
+
+ /*
+ * Now best_left and all of its children are eligible, and we are just
+ * looking for deadline == min_deadline
+ */
+ node = &best_left->run_node;
+ while (node) {
+ struct sched_entity *se = __node_2_se(node);
+
+ /* min_deadline is the current node */
+ if (se->deadline == se->min_deadline)
+ return se;
+
+ /* min_deadline is in the left branch */
if (node->rb_left &&
__node_2_se(node->rb_left)->min_deadline == se->min_deadline) {
node = node->rb_left;
continue;
}
+ /* else min_deadline is in the right branch */
node = node->rb_right;
}
+ return NULL;
+}
- if (!best || (curr && deadline_gt(deadline, best, curr)))
- best = curr;
+static struct sched_entity *pick_eevdf(struct cfs_rq *cfs_rq)
+{
+ struct sched_entity *se = __pick_eevdf(cfs_rq);
- if (unlikely(!best)) {
+ if (!se) {
struct sched_entity *left = __pick_first_entity(cfs_rq);
if (left) {
pr_err("EEVDF scheduling fail, picking leftmost\n");
@@ -919,7 +963,7 @@ static struct sched_entity *pick_eevdf(struct cfs_rq *cfs_rq)
}
}
- return best;
+ return se;
}
#ifdef CONFIG_SCHED_DEBUG
@@ -3653,6 +3697,8 @@ static void reweight_entity(struct cfs_rq *cfs_rq, struct sched_entity *se,
*/
deadline = div_s64(deadline * old_weight, weight);
se->deadline = se->vruntime + deadline;
+ if (se != cfs_rq->curr)
+ min_deadline_cb_propagate(&se->run_node, NULL);
}
#ifdef CONFIG_SMP