summaryrefslogtreecommitdiff
path: root/drivers/gpu/drm/scheduler
diff options
context:
space:
mode:
authorLuben Tuikov <luben.tuikov@amd.com>2020-12-03 22:17:20 -0500
committerChristian König <christian.koenig@amd.com>2020-12-08 14:38:09 +0100
commit71173e787cab9db4ca1fa6229477cb3d254bc285 (patch)
treeccb22c1a6f07a1fb12cf9843ef40fe66755bc4db /drivers/gpu/drm/scheduler
parent6efa4b465cfdaa9be251ba043253e302ddb9976f (diff)
drm/scheduler: Essentialize the job done callback
The job done callback is called from various places, in two ways: in job done role, and as a fence callback role. Essentialize the callback to an atom function to just complete the job, and into a second function as a prototype of fence callback which calls to complete the job. This is used in latter patches by the completion code. Signed-off-by: Luben Tuikov <luben.tuikov@amd.com> Reviewed-by: Christian König <christian.koenig@amd.com> Link: https://patchwork.freedesktop.org/patch/405574/ Cc: Alexander Deucher <Alexander.Deucher@amd.com> Cc: Andrey Grodzovsky <Andrey.Grodzovsky@amd.com> Cc: Christian König <christian.koenig@amd.com> Cc: Daniel Vetter <daniel.vetter@ffwll.ch> Signed-off-by: Christian König <christian.koenig@amd.com>
Diffstat (limited to 'drivers/gpu/drm/scheduler')
-rw-r--r--drivers/gpu/drm/scheduler/sched_main.c73
1 files changed, 40 insertions, 33 deletions
diff --git a/drivers/gpu/drm/scheduler/sched_main.c b/drivers/gpu/drm/scheduler/sched_main.c
index b694df12aaba..3eb7618a627d 100644
--- a/drivers/gpu/drm/scheduler/sched_main.c
+++ b/drivers/gpu/drm/scheduler/sched_main.c
@@ -60,8 +60,6 @@
#define to_drm_sched_job(sched_job) \
container_of((sched_job), struct drm_sched_job, queue_node)
-static void drm_sched_process_job(struct dma_fence *f, struct dma_fence_cb *cb);
-
/**
* drm_sched_rq_init - initialize a given run queue struct
*
@@ -163,6 +161,40 @@ drm_sched_rq_select_entity(struct drm_sched_rq *rq)
}
/**
+ * drm_sched_job_done - complete a job
+ * @s_job: pointer to the job which is done
+ *
+ * Finish the job's fence and wake up the worker thread.
+ */
+static void drm_sched_job_done(struct drm_sched_job *s_job)
+{
+ struct drm_sched_fence *s_fence = s_job->s_fence;
+ struct drm_gpu_scheduler *sched = s_fence->sched;
+
+ atomic_dec(&sched->hw_rq_count);
+ atomic_dec(&sched->score);
+
+ trace_drm_sched_process_job(s_fence);
+
+ dma_fence_get(&s_fence->finished);
+ drm_sched_fence_finished(s_fence);
+ dma_fence_put(&s_fence->finished);
+ wake_up_interruptible(&sched->wake_up_worker);
+}
+
+/**
+ * drm_sched_job_done_cb - the callback for a done job
+ * @f: fence
+ * @cb: fence callbacks
+ */
+static void drm_sched_job_done_cb(struct dma_fence *f, struct dma_fence_cb *cb)
+{
+ struct drm_sched_job *s_job = container_of(cb, struct drm_sched_job, cb);
+
+ drm_sched_job_done(s_job);
+}
+
+/**
* drm_sched_dependency_optimized
*
* @fence: the dependency fence
@@ -473,14 +505,14 @@ void drm_sched_start(struct drm_gpu_scheduler *sched, bool full_recovery)
if (fence) {
r = dma_fence_add_callback(fence, &s_job->cb,
- drm_sched_process_job);
+ drm_sched_job_done_cb);
if (r == -ENOENT)
- drm_sched_process_job(fence, &s_job->cb);
+ drm_sched_job_done(s_job);
else if (r)
DRM_ERROR("fence add callback failed (%d)\n",
r);
} else
- drm_sched_process_job(NULL, &s_job->cb);
+ drm_sched_job_done(s_job);
}
if (full_recovery) {
@@ -636,31 +668,6 @@ drm_sched_select_entity(struct drm_gpu_scheduler *sched)
}
/**
- * drm_sched_process_job - process a job
- *
- * @f: fence
- * @cb: fence callbacks
- *
- * Called after job has finished execution.
- */
-static void drm_sched_process_job(struct dma_fence *f, struct dma_fence_cb *cb)
-{
- struct drm_sched_job *s_job = container_of(cb, struct drm_sched_job, cb);
- struct drm_sched_fence *s_fence = s_job->s_fence;
- struct drm_gpu_scheduler *sched = s_fence->sched;
-
- atomic_dec(&sched->hw_rq_count);
- atomic_dec(&sched->score);
-
- trace_drm_sched_process_job(s_fence);
-
- dma_fence_get(&s_fence->finished);
- drm_sched_fence_finished(s_fence);
- dma_fence_put(&s_fence->finished);
- wake_up_interruptible(&sched->wake_up_worker);
-}
-
-/**
* drm_sched_get_cleanup_job - fetch the next finished job to be destroyed
*
* @sched: scheduler instance
@@ -809,9 +816,9 @@ static int drm_sched_main(void *param)
if (!IS_ERR_OR_NULL(fence)) {
s_fence->parent = dma_fence_get(fence);
r = dma_fence_add_callback(fence, &sched_job->cb,
- drm_sched_process_job);
+ drm_sched_job_done_cb);
if (r == -ENOENT)
- drm_sched_process_job(fence, &sched_job->cb);
+ drm_sched_job_done(sched_job);
else if (r)
DRM_ERROR("fence add callback failed (%d)\n",
r);
@@ -820,7 +827,7 @@ static int drm_sched_main(void *param)
if (IS_ERR(fence))
dma_fence_set_error(&s_fence->finished, PTR_ERR(fence));
- drm_sched_process_job(NULL, &sched_job->cb);
+ drm_sched_job_done(sched_job);
}
wake_up(&sched->job_scheduled);